Periodic Maintenance Plan

WARNING


Observe the following when performing maintenance, except when it is necessary to perform maintenance with the power on (e.g. during recalibration).

  1. Turn off the power and unplug all the cables.

  2. Allow the system to cool down for ten minutes.

Perform simple, periodic inspections so that the hopper runs safely and maintains its maximum level of performance.

Item Period Details
Calibration Six months, or 180 hours of vibration

See the following:

Calibration

Inspection of Fixing Bolts One month

See the following:

Inspection of Fixing Bolts

KEY POINTS


The information in the table above is for reference. The content and frequency of maintenance work must be changed to fit the system being used, the environment where it is used, and the amount of usage.