Installation Procedure

Installation of the Manipulator and related equipment should be performed by people who have received installation training provided by Epson and the suppliers.

CAUTION


  • The robot system must be installed to avoid interference with buildings, structures, utilities, other machines and equipment that may create a trapping hazard or pinch points.
  • Vibration (resonance) may occur during operation depending on rigidity of the base table. If vibration occurs, improve rigidity of the table or change the speed or acceleration and deceleration settings