Preparations for Calibration
KEY POINTS
Before performing calibration, confirm each of the following:
All parts have been removed from the container.
The fixing bolts used during transport have been removed (Hopper L/M only).
The hopper has been correctly fixed in place. See the following for details:
The container has been correctly mounted on the base.
The container is able to move freely without interfering with adjacent objects.
There are no devices nearby that cause unneeded vibrations.