Wiring
The CC-Link connector is a 5-pin open connector. Use the connector attached to the board for wiring.
Terminal name for each pin
| Terminal Number | Terminal Name |
|---|---|
| 1 | DA |
| 2 | DB |
| 3 | DG |
| 4 | SLD |
| 5 | FG |
Connect the CC-Link master module and the CC-Link slave board as follows.
KEY POINTS
Prepare the cable for CC-Link Ver.1.10 sold in the market as a communication cable.
Install terminating resistors at both ends of the network.
Use the terminating resistors attached to the CC-Link master station.
Make sure to disconnect the connectors only after turning OFF the power supply of the specific station.
Connect the shield wire for CC-Link to the "SLD" of each unit and ground the both ends via "FG".