Wiring

The CC-Link connector is a 5-pin open connector. Use the connector attached to the module for wiring.

Terminal name for each pin

Terminal Number Terminal Name
1 DA
2 DB
3 DG
4 SLD
5 FG

Connect the CC-Link master module and the CC-Link slave module as follows.

KEY POINTS


Prepare the cable for CC-Link Ver.1.10 sold in the market as a communication cable.

Install terminating resistors at both ends of the network.

Use the terminating resistors attached to the CC-Link master station.

Make sure to disconnect the connectors only after turning OFF the power supply of the specific station.

Connect the shield wire for CC-Link to the "SLD" of each unit and ground the both ends via "FG".