[Synchronize Project] Command (Project Menu)
If following conditions are fulfilled when PC and Controller are connected, [Synchronize Project] can be selected.
- When the project name on the PC and on the Controller was the same.
- When the file in the Controller has been changed after the last project build on the PC.
How to set the synchronization
Select Epson RC+ 8.0 Menu-[Project]-[Synchronize Project]. The message shown below will appear.
Click the [OK] button.
The dialog shown below appears. Select the method of synchronization and click the [Start] button.
The project on the PC and on the Controller synchronized.
Item | Description |
---|---|
Synchronization Method | Select the method of synchronization.
|
Function | Displays the file type. |
File Name | List of files in the project. |
PC Files | The update timestamps for PC files. |
Direction | Indicates the direction of file transfer.
|
Controller Files | The update timestamps for Controller files. |
Sending Status | Indicates the status of the file.
|
Start | Starts the synchronization. |
Close | Closes [Synchronize Project] dialog. When [Close] button clicked without project synchronization, error 10015 "Project could not be synchronized." is displayed. The synchronization will not be done and connection to the Controller will disconnected. |
When "Send files only from PC to Controller" is selected for Synchronization Method:
When "Send files only from Controller to PC" is selected for Synchronization Method: